Slant_fin TRDV Series Venting User Manual

Browse online or download User Manual for Equipment Slant_fin TRDV Series Venting. Slant/Fin TRDV Series Venting User Manual [es] [it] [en] [de]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGE
Basic Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1
Application (Flex-L Vent Terminal)
Direct Vent Applications . . . . . . . . . . . . . . . . . . . . . .2 & 3
I
nstalling the joint assembly . . . . . . . . . . . . . . . . . . . . . . . .4
Outside Terminal
Installing the outside terminal . . . . . . . . . . . . . . . . . . . . .5
Connections to the outside terminal . . . . . . . . . . . . . . . .6
Connections to appliance . . . . . . . . . . . . . . . . . . . . . . . . . .7
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Vent system part numbers . . . . . . . . . . . . . . . . . . . . . . . . .8
Alternate Field Controls Vent Terminal . . . . . . . . . . . . . .8-14
Slant/Fin TR SERIES, models TRDV are approved for installa-
tion as a direct vent system. The following basic guidelines
should be observed according to the venting system in use.
In addition, it is strongly recommended that the applicable
precautions for Natural Draft Applications be used.
In addition to all the pertinent information regarding Natural
Draft Applications whenever a Mechanical Draft Application is
used it should be installed using the following instructions and
Figures 2 and 3 as reference.
The terminating vent hood, and the inlet air hood are on
the same wall surface. and are on the wall opposite from
the prevailing wind wall, if possible.
All of the air for combustion to the burner is supplied
directly from the outside of the building or structure.
Not less than 12 in. above the total accumulated
snow and level grade.
Not less than 4 ft. horizontally or below any
window, and door or air inlet and also not less than
1 ft. above any of these openings.
Not less than 3 ft. above a powered air inlet
device that is within 10 ft.
Not less than 2 ft. from any other building.
At least 3 ft. from any inside corner of a building
At least 1 ft. from any roof soffit or ridge vent.
At least 7 ft. above any public walkway.
All of the vent construction consists of suitable materials,
and terminates at an approved stainless steel hood.
All of the vent piping must be sealed from air leaks.
The vent pipe bend radius is 12 in.
Brace metal strapping every 36 in. to support
vent pipe and prevent it from sagging.
Follow the national codes for the installation of oil burning
equipment in USA-NFPA 31, in Canada CAN/CSA - B139
and local regulations.
FIGURE 1: Slant/Fin model TRDV oil boiler with
vent kit
DIRECT VENT OIL-FIRED WATER BOILER
VENTING INSTALLATION INSTRUCTIONS
INTREPID TRDV Series
PUBLICATION NO. TRDV40-V
Printed in U.S.A. 613
Part No. 43-2770
Installation Considerations
Page view 0
1 2 3 4 5 6 ... 15 16

Summary of Contents

Page 1 - INTREPID TRDV Series

CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGEBasic Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 2 - FLEX- VENT TERMINAL

10 TRDV SERIESITEMS INCLUDED IN KIT:FDVS Direct Vent Termination*VRV-4 Vacuum Relief ValveBacking PlateInstallation InstructionSheet**Bagged Hardware*

Page 3 - TRDV SERIES 3

TRDV SERIES 11INSTALLATION OF FDVS DIRECT VENT SYSTEMInstallation of the Vent Termination1. Remove vent system components from box and inspect for dam

Page 4 - INSTALLING THE JOINT ASSEMBLY

12 TRDV SERIESINSTALLATION OF THE VENT TERMINATIONCOMBUSTION AIR TEE1. Assemble the combustion air tee assembly body to the vent termination outer pip

Page 5

TRDV SERIES 13APPLIANCE ADAPTER INSTALLATION:1. Apply a bead of sealant to appliance collar approx. 1” from end of collar (Figure 20).2. Remove all oi

Page 6

14 TRDV SERIESJOINT ASSEMBLY: VENT PIPE TO TERMINATIONAND APPLIANCE ADAPTERIf necessary, the vent pipe may be cut to length with a hacksaw orcut off s

Page 8 - MAINTENANCE

SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600FAX: (516) 484-5921 • Canada: Slant/Fin LTD/LTEE, Mississauga, Ontariowww.slantfin

Page 9 - FIELD CONTROLS VENT TERMINAL

2 TRDV SERIESFIGURE 2: Vent terminal installation locationsFLEX- VENT TERMINAL

Page 10 - FIELD CONTROLS

TRDV SERIES 3Do not install vent terminals on prevailing wind wall side of structure.Moisture and ice may form around terminal. Make sure the surface

Page 11

4 TRDV SERIESFIGURE 4: Joint assemblyINSTALLING THE JOINT ASSEMBLY1. Loosen the gear clamps attached to the adapter sleeve and slide the adapter sleev

Page 12

TRDV SERIES 5Use Figure 6 and Figure 7 to complete the following steps.1. Determine the terminal location.2. Cut 8-1/4in. diameter hole through the wa

Page 13

6 TRDV SERIESCONNECTIONS TO THE OUTSIDE TERMINALUse Figure 8 and Figure 9 to complete the following steps.1. Slide the inner section over the vent pip

Page 14

TRDV SERIES 7CONNECTIONS TO APPLIANCEUsing Figures 10 and 11 complete the following steps:1. Connect the appliance adapter to the vent pipe as per joi

Page 15 - TRDV SERIES 15

8 TRDV SERIESMAINTENANCEFor the appliance see the installation manual, TRDV-40, for the required maintenance. The vent system must be checked annually

Page 16

TRDV SERIES 9Do not install vent terminals on prevailing wind wall side of structure.Moisture and ice may form around terminal. Make sure the surface

Comments to this Manuals

No comments