CONTENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .PAGERatings and Dimensions . . . . . . . . . . . . . . . . . . . . . . . .
10INTREPIDCAUTION: When flushing float type low water cut-off control, hot waterand steam will flow out the blow down valve. Blow down valve is illus-
INTREPID11
12INTREPIDBASIC MODULE WIRING(less circulator)WIRING FOR PACKAGED STEAM BOILER EQUIPPED WITH McDONNELL NO.67 L.W.C.O.
INTREPID13WIRING FOR PACKAGED STEAM BOILERFor alternate option PS-801-120 L.W.C.O.or Hydrolevel Cycle Gard 450 L.W.C.O.BOILER WIRING DIAGRAM FOR RIELL
14INTREPIDSTEAM BOILER WIRING FOR RIELLO BURNER AND McDONELLMILLER P.S. 801 L.W.C.O. FOR CONNECTION TO LINE VOLTAGEWALL THERMOSTAT (BY OTHERS)WATER BO
INTREPID15
16INTREPIDBURNER DATA – BECKETT CF-375 BURNERS FOR PACKAGED BOILERS ONLY(For knocked-down & boiler burner units see publication no. TR-42KB)TR-60
INTREPID17
18INTREPIDNOTE: ELECTRODES ARE PRESET AT THE FACTORY.REGULATION OF THE TURBULATOR AND AIR SHUTTER FORPROPER COMBUSTIONTurbulator Setting1. Loosen nut,
INTREPID19
2INTREPIDStandard working pressure 30 psi water, 15 psi steam.All boilers hydrostatically tested — A.S.M.E.* For forced hot water heating systems wher
20INTREPID
INTREPID21I. EXTENDED SHUTDOWN, CLEANING OR REMOVAL OF BOILERFROM SERVICE.DANGER: Use CAUTION when handling chemicals and draining hotwater from a boi
-
-
SLANT/FIN CORPORATION, Greenvale, N.Y. 11548 • Phone: (516) 484-2600FAX: (516) 484-5921 • Canada: Slant/Fin LTD/LTEE, Mississauga, Ontariowww.slantfin
INTREPID3BOILER LOCATIONProvide a level, solid foundation for the boiler. Location should be nearthe chimney so that the Flue Pipe Connector or Breech
4INTREPIDAny oil-fired boiler must have a steady draft* and an ample supply ofcombustion air at all times during firing. If air supply or chimney draf
INTREPID5Figure 3a.Appliances located in confined spaces. Air frominside the building. See Table 2 (2.3).Figure 3b.Appliances located in confined spac
6INTREPIDINSTALLING CONTROLS ANDACCESSORIES ON BOILER UNITSNote: Jacket must be installed on boiler units prior to installationof trim.I. STEAM BOILER
INTREPID7C. HOT WATER RADIATION VENTING - Manual air vents should be installed at the top of all "drops"(where piping goes downward).Air mus
8INTREPIDVENT PIPING AND DRAFT REGULATORA. Vent pipes must be installed having the same diameter as the boiler outlet. (See page 2)B. Vent pipes and b
INTREPID9CLEANING AND FILLING A NEW STEAM BOILERI. BEFORE USING STEAM BOILERA. Check burner to be certain it is ready for firing. DO NOT FIRE into an
Comments to this Manuals