Slant_fin EC-20 Assembly Instructions User Manual

Browse online or download User Manual for Equipment Slant_fin EC-20 Assembly Instructions. Slant/Fin EC-20 Assembly Instructions User Manual [cs] [en] [pl] [de]

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
EUTECTIC EC-20 ASSEMBLY GUIDE
EUTECTIC EC-20
OIL-FIRED WATER BOILERS/NO. 2 OIL
ASSEMBLY INSTRUCTIONS
©Slant/Fin Corp. 2013 Printed in the U.S.A. 1113 Part # 470911000 Publication No. EC-20-50 Rev.B
Cable Clamp
Page view 0
1 2 3 4 5 6 ... 19 20

Summary of Contents

Page 1 - EUTECTIC EC-20

EUTECTIC EC-20 ASSEMBLY GUIDEEUTECTIC EC-20OIL-FIRED WATER BOILERS/NO. 2 OILASSEMBLY INSTRUCTIONS ©Slant/Fin Corp. 2013 • Printed in the U.S.A. 1113

Page 2 - Package List

Step 910EUTECTIC EC-20 ASSEMBLY GUIDEDangerLabelRating LabelBaffle LabelAttach BurnerInstructions Labelthat is packed withBurner

Page 3 - Step 1– Mounting Feet

Step 10Fitting the rear panel11EUTECTIC EC-20 ASSEMBLY GUIDEStep 11Remove the cleanout.Remove the cleanout.Remove the clean out trap

Page 4 - Mounting: Hinged door

Fit the rear panelStep 12Fitting the rear panel - continued12EUTECTIC EC-20 ASSEMBLY GUIDE

Page 5 - Adjusting the boiler door

Step 13Replace the clean out trap13EUTECTIC EC-20 ASSEMBLY GUIDEReplace the clean out trap

Page 6

Control panel assembly – Installing sensor bulbs14EUTECTIC EC-20 ASSEMBLY GUIDE- Then, insert the bulbs inside the pocket and maintain them with the

Page 7 - Thermatic

15EUTECTIC EC-20 ASSEMBLY GUIDEStep 15Fitting the front panel - Fitting the top panelConnect burner hanress to molex connector. Make sure it disconnec

Page 8 - Fitting the body insulation

16EUTECTIC EC-20 ASSEMBLY GUIDE

Page 9 - Assembling the burner

17EUTECTIC EC-20 ASSEMBLY GUIDE

Page 10 - EUTECTIC EC-20 ASSEMBLY GUIDE

18EUTECTIC EC-20 ASSEMBLY GUIDE

Page 11 - Remove the clean out trap

19EUTECTIC EC-20 ASSEMBLY GUIDE

Page 12 - Fit the rear panel

Package List2EUTECTIC EC-20 ASSEMBLY GUIDEBoiler Boiler Casting Sub-Assembly Jacket and InsulationControl PanelBasic or SF-10 forEC-20 SeriesEC-25 475

Page 13 - Replace the clean out trap

SLANT/FIN CORPORATION., Greenvale, N.Y. 11548 • www.slantfin.comPhone: (516) 484-2600 • Fax: (516) 484-5921In Canada: Slant/Fin LTD/LTEE, Mississauga,

Page 14

Step 1– Mounting Feet3EUTECTIC EC-20 ASSEMBLY GUIDE1. Fit the adjustable feet to the height converter (The feet are delivered with the screw bag in th

Page 15

Step 2Mounting: Hinged door4EUTECTIC EC-20 ASSEMBLY GUIDEStep 2Boiler casting assembly is normally shipped with boiler door hinges on the right when v

Page 16

Step 3Adjusting the boiler door5EUTECTIC EC-20 ASSEMBLY GUIDETo adjust the boiler door, adjust the top hinge:Untighten screw Aturn the screw B to posi

Page 17

Step 46EUTECTIC EC-20 ASSEMBLY GUIDEPut the baffles in place. Align the convection accelerators with the first fins.Close the boiler door and tighten

Page 18

Step 6Mounting: Front crosspiece with Basic or Thermatic Control7EUTECTIC EC-20 ASSEMBLY GUIDEThermaticBasic

Page 19

Step 7Fitting the body insulation8EUTECTIC EC-20 ASSEMBLY GUIDE

Page 20

Step 8Assembling the burner9EUTECTIC EC-20 ASSEMBLY GUIDECable ClampCable routing must comefrom left side for right handhinge (factory equipped).To be

Comments to this Manuals

No comments