EUTECTIC EC-20 ASSEMBLY GUIDEEUTECTIC EC-20OIL-FIRED WATER BOILERS/NO. 2 OILASSEMBLY INSTRUCTIONS ©Slant/Fin Corp. 2013 • Printed in the U.S.A. 1113
Step 910EUTECTIC EC-20 ASSEMBLY GUIDEDangerLabelRating LabelBaffle LabelAttach BurnerInstructions Labelthat is packed withBurner
Step 10Fitting the rear panel11EUTECTIC EC-20 ASSEMBLY GUIDEStep 11Remove the cleanout.Remove the cleanout.Remove the clean out trap
Fit the rear panelStep 12Fitting the rear panel - continued12EUTECTIC EC-20 ASSEMBLY GUIDE
Step 13Replace the clean out trap13EUTECTIC EC-20 ASSEMBLY GUIDEReplace the clean out trap
Control panel assembly – Installing sensor bulbs14EUTECTIC EC-20 ASSEMBLY GUIDE- Then, insert the bulbs inside the pocket and maintain them with the
15EUTECTIC EC-20 ASSEMBLY GUIDEStep 15Fitting the front panel - Fitting the top panelConnect burner hanress to molex connector. Make sure it disconnec
16EUTECTIC EC-20 ASSEMBLY GUIDE
17EUTECTIC EC-20 ASSEMBLY GUIDE
18EUTECTIC EC-20 ASSEMBLY GUIDE
19EUTECTIC EC-20 ASSEMBLY GUIDE
Package List2EUTECTIC EC-20 ASSEMBLY GUIDEBoiler Boiler Casting Sub-Assembly Jacket and InsulationControl PanelBasic or SF-10 forEC-20 SeriesEC-25 475
SLANT/FIN CORPORATION., Greenvale, N.Y. 11548 • www.slantfin.comPhone: (516) 484-2600 • Fax: (516) 484-5921In Canada: Slant/Fin LTD/LTEE, Mississauga,
Step 1– Mounting Feet3EUTECTIC EC-20 ASSEMBLY GUIDE1. Fit the adjustable feet to the height converter (The feet are delivered with the screw bag in th
Step 2Mounting: Hinged door4EUTECTIC EC-20 ASSEMBLY GUIDEStep 2Boiler casting assembly is normally shipped with boiler door hinges on the right when v
Step 3Adjusting the boiler door5EUTECTIC EC-20 ASSEMBLY GUIDETo adjust the boiler door, adjust the top hinge:Untighten screw Aturn the screw B to posi
Step 46EUTECTIC EC-20 ASSEMBLY GUIDEPut the baffles in place. Align the convection accelerators with the first fins.Close the boiler door and tighten
Step 6Mounting: Front crosspiece with Basic or Thermatic Control7EUTECTIC EC-20 ASSEMBLY GUIDEThermaticBasic
Step 7Fitting the body insulation8EUTECTIC EC-20 ASSEMBLY GUIDE
Step 8Assembling the burner9EUTECTIC EC-20 ASSEMBLY GUIDECable ClampCable routing must comefrom left side for right handhinge (factory equipped).To be
Comments to this Manuals